Why should one take this certification?
To demonstrate clear understanding and practical aspects and to get a visible recognition for this knowledge.
Table of Content:
https://www.vskills.in/certification/Vskills-Certified-Transformer-Winding-Mechanic-Table-of-Content
Practice Test
https://www.vskills.in/test/
Companies that hire Transformer Winding Mechanic
All small and medium companies need certified employees who have the requisite skills. There are more jobs opening up in the economy on a regular basis with the fast growth of the country.
Apply for Certification
By Net banking / Credit Card/Debit Card
We accept Visa/Master/Amex cards and all Indian Banks Debit Cards. There is no need to fill application form in case you are paying online.
Please click buy now to proceed for online payments.
TABLE OF CONTENT
Transformer- principle and construction
- Working principle of a transformer
- An ideal transformer
- Theory of on-load operation
- Construction
Voltage regulation of transformers
- EMF Equation
- Transformation Ratio
Measurement of losses in a Single phase transformer
- Open circuit of a single phase transformer
- Short circuit test of a single phase transformer
- Parts and construction of a Transformer
- Primary Winding
- Secondary Winding
- Transformer Tank
- Temperature gauge
- Explosion vent
- Conservator
- Function of conservator
- Breather
- Tap-changer
- Buchhoiz relay
- Cooling Tubes
- Inlet valves and outlet valves
- Losses in a transformer
- Copper Losses
- Iron losses
- Eddy current loss
- Hysteresis loss
- Efficiency of a transformer
Transformer on load
- Transformer with resistance and leakage reactance
- Voltage regulation
Testing and Commissioning of three-phase transformer
- Testing of power transformer
- Preliminary tests are
- Core insulation
- Core loss test
- Check of ratio polarity
- Preliminary load loss and impedance voltage
- Final tests
- Routine tests
- Type tests
Three-phase transformer connections
- Star/star connection
- Star-Delta
- Types of insulation testers
- Range of magneto-generator type insulation tester
Voltage regulation of three-phase transformers
Transformer Winding
- Causes of breakdown
- Principal object of maintenance
- Factors affecting the life of transformers
- Effect of moisture
- Effect of oxygen
- Effect of solid impurities
- Effect of varnishes
- Effect of Windings
- Maintenance procedure
- Safety precautions
- Breather
- Plain Breather
- Silica gel breather
- Gaskets
Transformer oil and testing
- Necessity of transformer oil
- Causes for deterioration of transformer oil
- Testing of transformer oil
- Field test of insulating oil
- Crackle test of transformer oil
- Dielectric test of transformer oil
Auto Transformers
- Construction
- Dimmer Stat or variac
Wind a small transformer
- Record the data
- Procedure of rewinding a transformer
- Coil winding machine
- Turn indicator
- Wire-feed control arrangements or setting pitch
- Coil length setting or layer Width setting
- Mandrel
- Wire size and turns
- Stampinsgs
- Testing of transformer after rewinding
- Insulation resistance test
- Load test
- Short circuit test