{"id":42652,"date":"2014-03-17T10:35:57","date_gmt":"2014-03-17T05:05:57","guid":{"rendered":"http:\/\/vskills.in\/certification\/tutorial\/?p=42652"},"modified":"2024-04-12T14:19:46","modified_gmt":"2024-04-12T08:49:46","slug":"project-performance-measures-2","status":"publish","type":"page","link":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/","title":{"rendered":"Project Performance Measures"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a ref=\"magnificPopup\" href=\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"400\" src=\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png\" alt=\"Project Performance Measures\" class=\"wp-image-93515\" srcset=\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png 750w, https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1-300x160.png 300w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><\/figure><\/div>\n\n\n<p><strong>Project Performance Measures<\/strong>&#8211; Let us learn all about the Project Performance Measures.<\/p>\n<h5><strong>Performance Metrics: Purpose<\/strong><\/h5>\n<p>What are the ways to measure how successful a Six Sigma project has been in improving quality or decreasing the number of defects?<\/p>\n<ul>\n<li>It is important to understand the meaning of \u201cdefects\u201d and \u201cdefective\u201d. Something has a defect if the result or outcome of a process is not what is expected. Something went wrong. The product may still be usable: a car with chipped paint can still be driven.<\/li>\n<li>Some engineers use \u201cdefective\u201d to mean a product which is not usable. However, for the purpose of quality control, \u201cdefective\u201d simply means \u201ccontains a defect,\u201d whether that defect is cosmetic or whether it actually affects the function of the part as intended.<\/li>\n<li>There can be different types of defects in a single part based on different causes.<\/li>\n<\/ul>\n<h5><strong>Performance Metrics\u2013 Definitions<\/strong><\/h5>\n<p>Here is a list of the Performance Metrics which are spelled out and then given an acronym if one is commonly used. The description is given of what this metric means.<\/p>\n<table border=\"0\"><colgroup> <col \/> <col \/> <col \/><\/colgroup>\n<tbody valign=\"top\">\n<tr>\n<td>\u00a0<\/td>\n<td><strong>Performance Metric<\/strong><\/td>\n<td><strong>Description<\/strong><\/td>\n<\/tr>\n<tr>\n<td><strong>1.<\/strong><\/td>\n<td>Percentage Defective<\/td>\n<td>What percentage of parts contain one or more defects?<\/td>\n<\/tr>\n<tr>\n<td><strong>2.<\/strong><\/td>\n<td>Parts per Million (PPM)<\/td>\n<td>What is the average number of defective parts per million? This is the same figure in metric 1 above of \u201cpercentage defective\u201d multiplied by 1,000,000.<\/td>\n<\/tr>\n<tr>\n<td><strong>3.<\/strong><\/td>\n<td>Defects per Unit (DPU)<\/td>\n<td>What is the average number of defects per unit?<\/td>\n<\/tr>\n<tr>\n<td><strong>4.<\/strong><\/td>\n<td>Defects per Opportunity (DPO)<\/td>\n<td>What is the average number of defects per opportunity? (where opportunity = number of different ways a defect can occur in a single part<\/td>\n<\/tr>\n<tr>\n<td><strong>5.<\/strong><\/td>\n<td>Defects per million Opportunities (DPMO)<\/td>\n<td>The same figure in metric 3 above of defects per opportunity multiplied by 1,000,000<\/td>\n<\/tr>\n<tr>\n<td><strong>6.<\/strong><\/td>\n<td>Rolled throughput yield (RTY)<\/td>\n<td>The yield stated as a percentage of the number of parts that go through a multi-stage process without a defect.<\/td>\n<\/tr>\n<tr>\n<td><strong>7.<\/strong><\/td>\n<td>Process sigma<\/td>\n<td>The sigma level associated with either the DPMO or PPM level found in metric 2 or 5 above.<\/td>\n<\/tr>\n<tr>\n<td><strong>8.<\/strong><\/td>\n<td>Cost of poor quality<\/td>\n<td>The cost of defects: either internal (rework\/scrap) or external (warranty\/product)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h5><strong>Performance metrics\u2013 Discussion and examples<\/strong><\/h5>\n<p>1. <strong>Percentage Defective<\/strong><\/p>\n<p>This is defined as the (Total number of defective parts)\/(Total number of parts) X 100. So, if there are 1,000 parts and 10 of those are defective, the percentage of defective parts is (10\/1000) X 100 = 1%<\/p>\n<p>2. <strong>PPM<\/strong><\/p>\n<p>Same as the ratio defined in metric 1, but multiplied by 1,000,000. For the example given above, 1 out of 100 parts are defective means that 10,000 out of 1,000,000 will be defective so the PPM = 10,000.<\/p>\n<p>NOTE: The PPM only tells you whether or not there exists one or more defects. To get a clear picture on how many defects there are (since each unit can have multiple defects), you need to go to metrics 3, 4, and 5.<\/p>\n<p>3. <strong>Defects per Unit<\/strong><\/p>\n<p>Here the AVERAGE number of defects per unit is calculated, which means you have to categorize the units into how many defects they have from 0, 1, 2, up to the maximum number. Take the following chart, which shows how many units out of 100 total have 0, 1, 2, etc., defects all the way to the maximum of 5.<\/p>\n<table border=\"0\"><colgroup> <col \/> <col \/> <col \/> <col \/> <col \/> <col \/> <col \/><\/colgroup>\n<tbody valign=\"top\">\n<tr>\n<td>Defects<\/td>\n<td>0<\/td>\n<td>1<\/td>\n<td>2<\/td>\n<td>3<\/td>\n<td>4<\/td>\n<td>5<\/td>\n<\/tr>\n<tr>\n<td># of Units<\/td>\n<td>70<\/td>\n<td>20<\/td>\n<td>5<\/td>\n<td>4<\/td>\n<td>9<\/td>\n<td>1<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The average number of defects is DPU = [Sum of all (D * U)]\/100 =<\/p>\n[(0 * 70) + (1 * 20) + (2 * 5) + (3 * 4) + (4 * 9) + (5 * 1)]\/100 = 47\/100 = 0.47<\/p>\n<p>4. <strong>Defects per Opportunity<\/strong><\/p>\n<p>How many ways are there for a defect to occur in a unit? This is called a defect \u201copportunity\u201d, which is akin to a \u201cfailure mode\u201d. Let\u2019s take the previous example in metric 3. Assume that each unit can have a defect occur in one of 6 possible ways. Then the number of opportunities for a defect in each unit is 6.<\/p>\n<p>Then DPO = DPU\/O = 0.47\/6 = 0.078333<\/p>\n<p>5. <strong>Defects per Million Opportunities<\/strong><\/p>\n<p>This is EXACTLY analogous to the difference between the Percentage Defective and the PPM, metrics 1 and 2, in that you get this by taking metric 4, the Defects per Opportunity, and multiplying by 1,000,000. So using the above example in metric 3:<\/p>\n<p>DPMO = DPO * 1,000,000 = 0.078333 * 1,000,000 = 78,333<\/p>\n<p>6.<strong> Rolled through Yield<\/strong><\/p>\n<p>This takes the percentage of units that pass through several subprocesses of an entire process without a defect.<\/p>\n<p>The number of units without a defect is the number of units that enter a process minus the number of defective units. Let the number of units that enter a process be P. The number of defective units is D. Then the first-pass yield for each subprocess or FPY is equal to (P \u2013 D)\/P. One you get each FPY for each subprocess, you multiply them altogether.<\/p>\n<p>If the yields of 4 subprocesses are 0.994, 0.987, 0.951 and 0.990, then the RTY = (0.994)(0.987)(0.951)(0.990) = 0.924 or 92.4%.<\/p>\n<p>7. <strong>Process Sigma<\/strong><\/p>\n<p>What is a Six Sigma process? It is the output of process that has a mean of 0 and standard deviation of 1, with an upper specification limit (USL) and lower specification limit (LSL) set at +3 and -3, respectively. However, there is also the matter of the 1.5-sigma shift which occurs over the long term.<\/p>\n<p>The result is the following two charts, one without and one with the 1.5-sigma shift.<\/p>\n<p><a ref=\"magnificPopup\" href=\"http:\/\/www.asq.org\/img\/qp\/093123_table1.gif\"><img decoding=\"async\" class=\"aligncenter\" src=\"http:\/\/4squareviews.files.wordpress.com\/2012\/12\/121512_0114_1.gif?w=468\" alt=\"\" border=\"0\" \/><\/a><\/p>\n<p>This is from ASQ\u2019s website under Quality Process. Refer to this site for more detailed information on the theory and mathematics behind this 1.5-sigma shift.<\/p>\n<p>8. <strong>Cost of poor quality<\/strong><\/p>\n<p>Also known as the cost of nonconformance, this takes the cost it takes to take care of defects either<\/p>\n<p>a) internally, i.e., before they leave the company, through scrapping, repairing, or reworking the parts, or<\/p>\n<p>b) externally, i.e., after they leave the company, through costs of warranty, returned merchandise, or product liability claims and lawsuits.<\/p>\n<p>This is obviously more difficult to calculate because the external costs can be delayed by months or even years after the products are sold. It\u2019s best, therefore, to measure those costs which are relatively easy to calculate and quickly available, i.e., the internal costs of poor quality.<\/p>\n<p>The above are some of the metrics you can use BEFORE your Six Sigma Project and then AFTER your project to show that the countermeasures you have devised have had a positive effect. How certain can you be of this? That is the subject of the measurement section, which comes after this Define section of the Body of Knowledge is done.<\/p>\n<div class=\"apply\">\n<p>Test Your Six Sigma Black Belt Skills By Taking Our Practice Tests on This <a href=\"http:\/\/www.vskills.in\/practice\/quiz\/Six-Sigma-Black-Belt\">Link<\/a><\/p>\n<h5>Apply for Six Sigma Black Belt Certification Now!!<\/h5>\n<p><a href=\"http:\/\/www.vskills.in\/certification\/Certified-Six-Sigma-Black-Belt-Professional\">http:\/\/www.vskills.in\/certification\/Certified-Six-Sigma-Black-Belt-Professional<\/a><\/p>\n<\/div>\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a href=\"https:\/\/www.vskills.in\/practice\/six-sigma-black-belt\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"961\" height=\"150\" src=\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/1Z0-1050-20-Oracle-Payroll-Cloud-2020-Implementation-Essentials-1.png\" alt=\"\" class=\"wp-image-93217\" srcset=\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/1Z0-1050-20-Oracle-Payroll-Cloud-2020-Implementation-Essentials-1.png 961w, https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/1Z0-1050-20-Oracle-Payroll-Cloud-2020-Implementation-Essentials-1-300x47.png 300w\" sizes=\"auto, (max-width: 961px) 100vw, 961px\" \/><\/a><\/figure><\/div>\n\n\n\n<p><a href=\"https:\/\/www.vskills.in\/certification\/tutorial\/six-sigma-black-belt-certification\/\" target=\"_blank\" rel=\"noreferrer noopener\">Go back to Tutorial<\/a>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; <a href=\"https:\/\/www.vskills.in\/certification\/Certified-Six-Sigma-Black-Belt-Professional\" target=\"_blank\" rel=\"noreferrer noopener\">Go to Home Page<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Performance Measures&#8211; Let us learn all about the Project Performance Measures. Performance Metrics: Purpose What are the ways to measure how successful a Six Sigma project has been in improving quality or decreasing the number of defects? It is important to understand the meaning of \u201cdefects\u201d and \u201cdefective\u201d. Something has a defect if the&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"categories":[3897,6280],"tags":[9750,9747,9749,9751,9748,6894,6848,6871],"class_list":["post-42652","page","type-page","status-publish","hentry","category-quality","category-six-sigma-black-belt-quality","tag-certified-six-sigma-black-belt-professional-course-outline","tag-certified-six-sigma-black-belt-professional-exam-details","tag-certified-six-sigma-black-belt-professional-free-practice-test","tag-certified-six-sigma-black-belt-professional-online-tutorial","tag-certified-six-sigma-black-belt-professional-preparatory-guide","tag-project-performance-measures","tag-quality","tag-tutorials"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Six Sigma Black Belt Tutorial | Project Performance Measures<\/title>\n<meta name=\"description\" content=\"Project Performance Measures A. Performance Metrics: purpose What are the ways to measure how successful a Six Sigma project has been in improving quality..\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Six Sigma Black Belt Tutorial | Project Performance Measures\" \/>\n<meta property=\"og:description\" content=\"Project Performance Measures A. Performance Metrics: purpose What are the ways to measure how successful a Six Sigma project has been in improving quality..\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Tutorial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/vskills.in\/\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-12T08:49:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/\",\"name\":\"Six Sigma Black Belt Tutorial | Project Performance Measures\",\"isPartOf\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png\",\"datePublished\":\"2014-03-17T05:05:57+00:00\",\"dateModified\":\"2024-04-12T08:49:46+00:00\",\"description\":\"Project Performance Measures A. Performance Metrics: purpose What are the ways to measure how successful a Six Sigma project has been in improving quality..\",\"breadcrumb\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#primaryimage\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png\",\"contentUrl\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png\",\"width\":750,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.vskills.in\/certification\/tutorial\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Performance Measures\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#website\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/\",\"name\":\"Tutorial\",\"description\":\"Vskills - A initiative in elearning and certification\",\"publisher\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.vskills.in\/certification\/tutorial\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#organization\",\"name\":\"Vskills\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg\",\"contentUrl\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg\",\"width\":73,\"height\":55,\"caption\":\"Vskills\"},\"image\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/vskills.in\/\",\"https:\/\/x.com\/vskills_in\",\"https:\/\/www.linkedin.com\/company-beta\/1371554\/\",\"https:\/\/www.youtube.com\/channel\/UCMWnscxPwRF_PqXo9B7q_Tw\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Six Sigma Black Belt Tutorial | Project Performance Measures","description":"Project Performance Measures A. Performance Metrics: purpose What are the ways to measure how successful a Six Sigma project has been in improving quality..","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/","og_locale":"en_US","og_type":"article","og_title":"Six Sigma Black Belt Tutorial | Project Performance Measures","og_description":"Project Performance Measures A. Performance Metrics: purpose What are the ways to measure how successful a Six Sigma project has been in improving quality..","og_url":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/","og_site_name":"Tutorial","article_publisher":"https:\/\/www.facebook.com\/vskills.in\/","article_modified_time":"2024-04-12T08:49:46+00:00","og_image":[{"url":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png","type":"","width":"","height":""}],"twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/","url":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/","name":"Six Sigma Black Belt Tutorial | Project Performance Measures","isPartOf":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#primaryimage"},"image":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png","datePublished":"2014-03-17T05:05:57+00:00","dateModified":"2024-04-12T08:49:46+00:00","description":"Project Performance Measures A. Performance Metrics: purpose What are the ways to measure how successful a Six Sigma project has been in improving quality..","breadcrumb":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#primaryimage","url":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png","contentUrl":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2020\/12\/Company-ProfileThe-Ideal-Employee-From-Hiring-to-Onboarding-Team-Responsibilities-Employee-Response-HR-Satisfaction-Survey-Additional-Recommendations-6-1.png","width":750,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-performance-measures-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.vskills.in\/certification\/tutorial\/"},{"@type":"ListItem","position":2,"name":"Project Performance Measures"}]},{"@type":"WebSite","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#website","url":"https:\/\/www.vskills.in\/certification\/tutorial\/","name":"Tutorial","description":"Vskills - A initiative in elearning and certification","publisher":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vskills.in\/certification\/tutorial\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#organization","name":"Vskills","url":"https:\/\/www.vskills.in\/certification\/tutorial\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/","url":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg","contentUrl":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg","width":73,"height":55,"caption":"Vskills"},"image":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/vskills.in\/","https:\/\/x.com\/vskills_in","https:\/\/www.linkedin.com\/company-beta\/1371554\/","https:\/\/www.youtube.com\/channel\/UCMWnscxPwRF_PqXo9B7q_Tw"]}]}},"_links":{"self":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages\/42652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/comments?post=42652"}],"version-history":[{"count":13,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages\/42652\/revisions"}],"predecessor-version":[{"id":93517,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages\/42652\/revisions\/93517"}],"wp:attachment":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/media?parent=42652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/categories?post=42652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/tags?post=42652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}