{"id":128586,"date":"2023-05-08T12:04:04","date_gmt":"2023-05-08T06:34:04","guid":{"rendered":"https:\/\/www.vskills.in\/certification\/tutorial\/?page_id=128586"},"modified":"2024-04-12T14:32:21","modified_gmt":"2024-04-12T09:02:21","slug":"project-quality-and-performance-management-glossary","status":"publish","type":"page","link":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/","title":{"rendered":"Project Quality and Performance Management Glossary"},"content":{"rendered":"\n<p>Important definitions and terminologies used in Project Quality and Performance Management<\/p>\n\n\n<div id=\"glossary\">\n<div id=\"letter-links\" style=\"font-size: 30px;letter-spacing:20px;\"><a href=\"#A\">A<\/a><a href=\"#B\">B<\/a><a href=\"#C\">C<\/a><a href=\"#D\">D<\/a><a href=\"#E\">E<\/a><a href=\"#F\">F<\/a><a href=\"#G\">G<\/a><a href=\"#H\">H<\/a><a href=\"#I\">I<\/a><a href=\"#K\">K<\/a><a href=\"#L\">L<\/a><a href=\"#M\">M<\/a><a href=\"#N\">N<\/a><a href=\"#O\">O<\/a><a href=\"#P\">P<\/a><a href=\"#Q\">Q<\/a><a href=\"#R\">R<\/a><a href=\"#S\">S<\/a><a href=\"#T\">T<\/a><a href=\"#V\">V<\/a><a href=\"#W\">W<\/a><\/div>\n<h2 id=\"A\">A<\/h2>\n<ul>\n<li>Abstract resource in Project Quality and Performance Management<\/li>\n<li>Acceptance criteria in Project Quality and Performance Management<\/li>\n<li>Acceptance in Project Quality and Performance Management<\/li>\n<li>Acceptance test in Project Quality and Performance Management<\/li>\n<li>Accountability Matrix in Project Quality and Performance Management<\/li>\n<li>Accounting Quality (Quality of Earnings) in Project Quality and Performance Management<\/li>\n<li>Accrued costs in Project Quality and Performance Management<\/li>\n<li>Acquisition strategy in Project Quality and Performance Management<\/li>\n<li>Action Item in Project Quality and Performance Management<\/li>\n<li>Active in Project Quality and Performance Management<\/li>\n<li>Activities ID in Project Quality and Performance Management<\/li>\n<li>Activity Definition in Project Quality and Performance Management<\/li>\n<li>Activity Description (AD) in Project Quality and Performance Management<\/li>\n<li>Activity Duration Estimating in Project Quality and Performance Management<\/li>\n<li>Activity duration in Project Quality and Performance Management<\/li>\n<li>Activity file in Project Quality and Performance Management<\/li>\n<li>Activity in Project Quality and Performance Management<\/li>\n<li>Activity status in Project Quality and Performance Management<\/li>\n<li>Activity-On-Arrow (AOA) in Project Quality and Performance Management<\/li>\n<li>Activity-On-Node (AON) in Project Quality and Performance Management<\/li>\n<li>Activity-on-node network in Project Quality and Performance Management<\/li>\n<li>Actual Cost (AC) in Project Quality and Performance Management<\/li>\n<li>Actual Cost of Work Performed (ACWP) in Project Quality and Performance Management<\/li>\n<li>Actual Cost of Work Performed (ACWP)(Spent Costs) in Project Quality and Performance Management<\/li>\n<li>Actual dates in Project Quality and Performance Management<\/li>\n<li>Actual direct costs in Project Quality and Performance Management<\/li>\n<li>Actual Finish Date (AF) in Project Quality and Performance Management<\/li>\n<li>Actual Start Date (AS) in Project Quality and Performance Management<\/li>\n<li>ACWP in Project Quality and Performance Management<\/li>\n<li>AD in Project Quality and Performance Management<\/li>\n<li>Adjourning in Project Quality and Performance Management<\/li>\n<li>ADM in Project Quality and Performance Management<\/li>\n<li>Administrative Closure in Project Quality and Performance Management<\/li>\n<li>Advanced material release in Project Quality and Performance Management<\/li>\n<li>AF in Project Quality and Performance Management<\/li>\n<li>Agile Methodology in Project Quality and Performance Management<\/li>\n<li>AND relationship in Project Quality and Performance Management<\/li>\n<li>AOA in Project Quality and Performance Management<\/li>\n<li>AON in Project Quality and Performance Management<\/li>\n<li>APIs in Project Quality and Performance Management<\/li>\n<li>Application Area in Project Quality and Performance Management<\/li>\n<li>Approval in Project Quality and Performance Management<\/li>\n<li>Approval to proceed in Project Quality and Performance Management<\/li>\n<li>Approved in Project Quality and Performance Management<\/li>\n<li>Arrow diagram in Project Quality and Performance Management<\/li>\n<li>Arrow diagram method in Project Quality and Performance Management<\/li>\n<li>Arrow Diagramming Method (ADM) in Project Quality and Performance Management<\/li>\n<li>Arrow in Project Quality and Performance Management<\/li>\n<li>AS in Project Quality and Performance Management<\/li>\n<li>As late as possible (ALAP) in Project Quality and Performance Management<\/li>\n<li>As soon as possible (ASAP) in Project Quality and Performance Management<\/li>\n<li>As-of Date in Project Quality and Performance Management<\/li>\n<li>Associated revenue in Project Quality and Performance Management<\/li>\n<li>Assumption in Project Quality and Performance Management<\/li>\n<li>Assumptions in Project Quality and Performance Management<\/li>\n<li>Audit in Project Quality and Performance Management<\/li>\n<li>Authorization in Project Quality and Performance Management<\/li>\n<li>Authorized un-priced work in Project Quality and Performance Management<\/li>\n<li>Authorized work in Project Quality and Performance Management<\/li>\n<li>Automatic decision event in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"B\">B<\/h2>\n<ul>\n<li>BAC in Project Quality and Performance Management<\/li>\n<li>Backward Pas in Project Quality and Performance Management<\/li>\n<li>Backward Pass in Project Quality and Performance Management<\/li>\n<li>Balanced matrix in Project Quality and Performance Management<\/li>\n<li>Balanced Scorecard in Project Quality and Performance Management<\/li>\n<li>Bar Char in Project Quality and Performance Management<\/li>\n<li>Bar Chart in Project Quality and Performance Management<\/li>\n<li>Baseline cost in Project Quality and Performance Management<\/li>\n<li>Baseline dates in Project Quality and Performance Management<\/li>\n<li>Baseline Finish Date in Project Quality and Performance Management<\/li>\n<li>Baseline in Project Quality and Performance Management<\/li>\n<li>Baseline review in Project Quality and Performance Management<\/li>\n<li>Baseline schedule in Project Quality and Performance Management<\/li>\n<li>Baseline Start Date in Project Quality and Performance Management<\/li>\n<li>BCWP in Project Quality and Performance Management<\/li>\n<li>BCWS in Project Quality and Performance Management<\/li>\n<li>Benchmark in Project Quality and Performance Management<\/li>\n<li>Benchmarking in Project Quality and Performance Management<\/li>\n<li>Benefits framework in Project Quality and Performance Management<\/li>\n<li>Benefits in Project Quality and Performance Management<\/li>\n<li>Benefits management in Project Quality and Performance Management<\/li>\n<li>Benefits management plan in Project Quality and Performance Management<\/li>\n<li>Best Practice in Project Quality and Performance Management<\/li>\n<li>Bid analysis in Project Quality and Performance Management<\/li>\n<li>Bid in Project Quality and Performance Management<\/li>\n<li>Bottom up cost estimating in Project Quality and Performance Management<\/li>\n<li>Brainstorming in Project Quality and Performance Management<\/li>\n<li>Breakdown structure in Project Quality and Performance Management<\/li>\n<li>Budget at completion (BAC) in Project Quality and Performance Management<\/li>\n<li>Budget cost in Project Quality and Performance Management<\/li>\n<li>Budget element in Project Quality and Performance Management<\/li>\n<li>Budget Estimate in Project Quality and Performance Management<\/li>\n<li>Budget in Project Quality and Performance Management<\/li>\n<li>Budget unit in Project Quality and Performance Management<\/li>\n<li>Budgetary control in Project Quality and Performance Management<\/li>\n<li>Budgeted Cost of Work Performed (BCWP) in Project Quality and Performance Management<\/li>\n<li>Budgeted Cost of Work Scheduled (BCWS) in Project Quality and Performance Management<\/li>\n<li>Budgeting in Project Quality and Performance Management<\/li>\n<li>Burden in Project Quality and Performance Management<\/li>\n<li>Business case in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"C\">C<\/h2>\n<ul>\n<li>Calendar Unit in Project Quality and Performance Management<\/li>\n<li>Calendars in Project Quality and Performance Management<\/li>\n<li>Cancelled in Project Quality and Performance Management<\/li>\n<li>Capability Maturity Model Integration in Project Quality and Performance Management<\/li>\n<li>Capacity Planning in Project Quality and Performance Management<\/li>\n<li>Capital cost in Project Quality and Performance Management<\/li>\n<li>Capital employed in Project Quality and Performance Management<\/li>\n<li>Cascade chart in Project Quality and Performance Management<\/li>\n<li>Cash flow in Project Quality and Performance Management<\/li>\n<li>Cash flow, net in Project Quality and Performance Management<\/li>\n<li>Cause and Effect Diagram in Project Quality and Performance Management<\/li>\n<li>Champion in Project Quality and Performance Management<\/li>\n<li>Change Control Board (CCB) in Project Quality and Performance Management<\/li>\n<li>Change control in Project Quality and Performance Management<\/li>\n<li>Change in Scope in Project Quality and Performance Management<\/li>\n<li>Change log in Project Quality and Performance Management<\/li>\n<li>Change management in Project Quality and Performance Management<\/li>\n<li>Change Management Plan in Project Quality and Performance Management<\/li>\n<li>Change Request in Project Quality and Performance Management<\/li>\n<li>Chart of Accounts in Project Quality and Performance Management<\/li>\n<li>Charter in Project Quality and Performance Management<\/li>\n<li>Child activity in Project Quality and Performance Management<\/li>\n<li>Client Expectations in Project Quality and Performance Management<\/li>\n<li>Client or Customer in Project Quality and Performance Management<\/li>\n<li>Close out in Project Quality and Performance Management<\/li>\n<li>Closure in Project Quality and Performance Management<\/li>\n<li>CMM in Project Quality and Performance Management<\/li>\n<li>Code of Accounts in Project Quality and Performance Management<\/li>\n<li>Commissioning in Project Quality and Performance Management<\/li>\n<li>Commitment in Project Quality and Performance Management<\/li>\n<li>Committed costs in Project Quality and Performance Management<\/li>\n<li>Common Cause in Project Quality and Performance Management<\/li>\n<li>Communication in Project Quality and Performance Management<\/li>\n<li>Communications planning in Project Quality and Performance Management<\/li>\n<li>Completed in Project Quality and Performance Management<\/li>\n<li>Completion date in Project Quality and Performance Management<\/li>\n<li>Compound risk in Project Quality and Performance Management<\/li>\n<li>Conception phase in Project Quality and Performance Management<\/li>\n<li>Concurrent Engineering in Project Quality and Performance Management<\/li>\n<li>Configuration identification in Project Quality and Performance Management<\/li>\n<li>Configuration in Project Quality and Performance Management<\/li>\n<li>Configuration item in Project Quality and Performance Management<\/li>\n<li>Configuration management in Project Quality and Performance Management<\/li>\n<li>Configuration status accounting in Project Quality and Performance Management<\/li>\n<li>Configurations audit in Project Quality and Performance Management<\/li>\n<li>Configurations control in Project Quality and Performance Management<\/li>\n<li>Conflict management in Project Quality and Performance Management<\/li>\n<li>Constraint in Project Quality and Performance Management<\/li>\n<li>Consumable resource in Project Quality and Performance Management<\/li>\n<li>Contingencies in Project Quality and Performance Management<\/li>\n<li>Contingency Allowance in Project Quality and Performance Management<\/li>\n<li>Contingency in Project Quality and Performance Management<\/li>\n<li>Contingency plan in Project Quality and Performance Management<\/li>\n<li>Contingency planning in Project Quality and Performance Management<\/li>\n<li>Contingency Reserve in Project Quality and Performance Management<\/li>\n<li>Continuous Improvement in Project Quality and Performance Management<\/li>\n<li>Contract Administration in Project Quality and Performance Management<\/li>\n<li>Contract budget base in Project Quality and Performance Management<\/li>\n<li>Contract Close-out in Project Quality and Performance Management<\/li>\n<li>Contract in Project Quality and Performance Management<\/li>\n<li>Contract target cost in Project Quality and Performance Management<\/li>\n<li>Contract target price in Project Quality and Performance Management<\/li>\n<li>Contractor in Project Quality and Performance Management<\/li>\n<li>Control Chart in Project Quality and Performance Management<\/li>\n<li>Control Charts in Project Quality and Performance Management<\/li>\n<li>Control in Project Quality and Performance Management<\/li>\n<li>Control Plan in Project Quality and Performance Management<\/li>\n<li>Control Project Quality in Project Quality and Performance Management<\/li>\n<li>Coordinated matrix in Project Quality and Performance Management<\/li>\n<li>Coordination in Project Quality and Performance Management<\/li>\n<li>Corrective Action in Project Quality and Performance Management<\/li>\n<li>Cost account in Project Quality and Performance Management<\/li>\n<li>Cost account manager in Project Quality and Performance Management<\/li>\n<li>Cost benefit analysis in Project Quality and Performance Management<\/li>\n<li>Cost breakdown structure in Project Quality and Performance Management<\/li>\n<li>Cost budgeting in Project Quality and Performance Management<\/li>\n<li>Cost center in Project Quality and Performance Management<\/li>\n<li>Cost code in Project Quality and Performance Management<\/li>\n<li>Cost Control in Project Quality and Performance Management<\/li>\n<li>Cost control point in Project Quality and Performance Management<\/li>\n<li>Cost control system in Project Quality and Performance Management<\/li>\n<li>Cost curve in Project Quality and Performance Management<\/li>\n<li>Cost element in Project Quality and Performance Management<\/li>\n<li>Cost Estimating in Project Quality and Performance Management<\/li>\n<li>Cost incurred in Project Quality and Performance Management<\/li>\n<li>Cost management in Project Quality and Performance Management<\/li>\n<li>Cost of Quality in Project Quality and Performance Management<\/li>\n<li>Cost overrun in Project Quality and Performance Management<\/li>\n<li>Cost Performance Index (CPI) in Project Quality and Performance Management<\/li>\n<li>Cost performance report in Project Quality and Performance Management<\/li>\n<li>Cost plan in Project Quality and Performance Management<\/li>\n<li>Cost Plus Fixed Fee (CPFF) Contract in Project Quality and Performance Management<\/li>\n<li>Cost Plus Incentive Fee (CPIF) Contract in Project Quality and Performance Management<\/li>\n<li>Cost reimbursement type contracts in Project Quality and Performance Management<\/li>\n<li>Cost-Benefit Analysis in Project Quality and Performance Management<\/li>\n<li>Cost-time resource sheet (CTR) in Project Quality and Performance Management<\/li>\n<li>CPFF in Project Quality and Performance Management<\/li>\n<li>CPI in Project Quality and Performance Management<\/li>\n<li>CPIF in Project Quality and Performance Management<\/li>\n<li>CPM in Project Quality and Performance Management<\/li>\n<li>Crashing in Project Quality and Performance Management<\/li>\n<li>Critical Activity in Project Quality and Performance Management<\/li>\n<li>Critical Chain Method in Project Quality and Performance Management<\/li>\n<li>Critical path analysis in Project Quality and Performance Management<\/li>\n<li>Critical Path in Project Quality and Performance Management<\/li>\n<li>Critical Path Method (CPM) in Project Quality and Performance Management<\/li>\n<li>Critical Path Method in Project Quality and Performance Management<\/li>\n<li>Critical performance indicator in Project Quality and Performance Management<\/li>\n<li>Critical success factor in Project Quality and Performance Management<\/li>\n<li>Critical to Quality in Project Quality and Performance Management<\/li>\n<li>Criticality index in Project Quality and Performance Management<\/li>\n<li>Current Finish Date in Project Quality and Performance Management<\/li>\n<li>Current Start Date in Project Quality and Performance Management<\/li>\n<li>Customer Focus and Quality Management in Project Quality and Performance Management<\/li>\n<li>Customer in Project Quality and Performance Management<\/li>\n<li>Customer Satisfaction in Project Quality and Performance Management<\/li>\n<li>Cut-off date in Project Quality and Performance Management<\/li>\n<li>CV in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"D\">D<\/h2>\n<ul>\n<li>Dangle in Project Quality and Performance Management<\/li>\n<li>Data Collection in Project Quality and Performance Management<\/li>\n<li>Data Date (DD) in Project Quality and Performance Management<\/li>\n<li>Data Sampling in Project Quality and Performance Management<\/li>\n<li>DD in Project Quality and Performance Management<\/li>\n<li>Decision event in Project Quality and Performance Management<\/li>\n<li>Decision in Project Quality and Performance Management<\/li>\n<li>Defect in Project Quality and Performance Management<\/li>\n<li>Definitive Estimate in Project Quality and Performance Management<\/li>\n<li>Delaying resource in Project Quality and Performance Management<\/li>\n<li>Delegation in Project Quality and Performance Management<\/li>\n<li>Deliberate decision event in Project Quality and Performance Management<\/li>\n<li>Deliverable in Project Quality and Performance Management<\/li>\n<li>Deliverables in Project Quality and Performance Management<\/li>\n<li>Delphi technique in Project Quality and Performance Management<\/li>\n<li>Denied in Project Quality and Performance Management<\/li>\n<li>Dependency arrow in Project Quality and Performance Management<\/li>\n<li>Dependency in Project Quality and Performance Management<\/li>\n<li>Design and development in Project Quality and Performance Management<\/li>\n<li>Design authority in Project Quality and Performance Management<\/li>\n<li>Design of Experiments in Project Quality and Performance Management<\/li>\n<li>Deterministic network in Project Quality and Performance Management<\/li>\n<li>DFX in Project Quality and Performance Management<\/li>\n<li>Direct costs in Project Quality and Performance Management<\/li>\n<li>Discounted cash flow (DCF) in Project Quality and Performance Management<\/li>\n<li>Discrete milestone in Project Quality and Performance Management<\/li>\n<li>DU in Project Quality and Performance Management<\/li>\n<li>Dummy activity in activity on arrow network in Project Quality and Performance Management<\/li>\n<li>Dummy Activity in Project Quality and Performance Management<\/li>\n<li>Duration (DU) in Project Quality and Performance Management<\/li>\n<li>Duration Compression in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"E\">E<\/h2>\n<ul>\n<li>EAC in Project Quality and Performance Management<\/li>\n<li>Earliest feasible date in Project Quality and Performance Management<\/li>\n<li>Early dates in Project Quality and Performance Management<\/li>\n<li>Early Finish Date (EF) in Project Quality and Performance Management<\/li>\n<li>Early Start Date (ES) in Project Quality and Performance Management<\/li>\n<li>Earned hours in Project Quality and Performance Management<\/li>\n<li>Earned Value (EV) in Project Quality and Performance Management<\/li>\n<li>Earned value analysis in Project Quality and Performance Management<\/li>\n<li>Earned value cost control in Project Quality and Performance Management<\/li>\n<li>Earned Value Management in Project Quality and Performance Management<\/li>\n<li>EF in Project Quality and Performance Management<\/li>\n<li>Effort in Project Quality and Performance Management<\/li>\n<li>Effort remaining in Project Quality and Performance Management<\/li>\n<li>Effort-driven activity in Project Quality and Performance Management<\/li>\n<li>Elapsed time in Project Quality and Performance Management<\/li>\n<li>End activity in Project Quality and Performance Management<\/li>\n<li>End event (of a project) in Project Quality and Performance Management<\/li>\n<li>Environmental factoring in Project Quality and Performance Management<\/li>\n<li>Equivalent activity in Project Quality and Performance Management<\/li>\n<li>ES in Project Quality and Performance Management<\/li>\n<li>Estimate at completion (EAC) in Project Quality and Performance Management<\/li>\n<li>Estimate in Project Quality and Performance Management<\/li>\n<li>Estimate to complete (ETC) in Project Quality and Performance Management<\/li>\n<li>Estimating in Project Quality and Performance Management<\/li>\n<li>ETC in Project Quality and Performance Management<\/li>\n<li>EV in Project Quality and Performance Management<\/li>\n<li>Event in Project Quality and Performance Management<\/li>\n<li>Event-on-Node in Project Quality and Performance Management<\/li>\n<li>Exception report in Project Quality and Performance Management<\/li>\n<li>Exceptions in Project Quality and Performance Management<\/li>\n<li>Exclusive OR relationship in Project Quality and Performance Management<\/li>\n<li>Execution phase in Project Quality and Performance Management<\/li>\n<li>Expected Monetary Value in Project Quality and Performance Management<\/li>\n<li>Expenditure in Project Quality and Performance Management<\/li>\n<li>External constraint in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"F\">F<\/h2>\n<ul>\n<li>Failure Mode and Effects Analysis in Project Quality and Performance Management<\/li>\n<li>Fallback plan in Project Quality and Performance Management<\/li>\n<li>Fast in Project Quality and Performance Management<\/li>\n<li>Fault Tree Analysis in Project Quality and Performance Management<\/li>\n<li>Feasibility phase in Project Quality and Performance Management<\/li>\n<li>Feasibility study in Project Quality and Performance Management<\/li>\n<li>Feasible schedule in Project Quality and Performance Management<\/li>\n<li>FF in Project Quality and Performance Management<\/li>\n<li>FFP in Project Quality and Performance Management<\/li>\n<li>Final report in Project Quality and Performance Management<\/li>\n<li>Finish date in Project Quality and Performance Management<\/li>\n<li>Finish-to-Finish (FF) in Project Quality and Performance Management<\/li>\n<li>Finish-to-Start (FS) in Project Quality and Performance Management<\/li>\n<li>Finish-to-start lag in Project Quality and Performance Management<\/li>\n<li>Finishing activity in Project Quality and Performance Management<\/li>\n<li>Firm Fixed Price (FFP) Contract in Project Quality and Performance Management<\/li>\n<li>Fishbone Diagram in Project Quality and Performance Management<\/li>\n<li>Fixed date in Project Quality and Performance Management<\/li>\n<li>Fixed finish in Project Quality and Performance Management<\/li>\n<li>Fixed Price Incentive Fee (FPIF) Contract in Project Quality and Performance Management<\/li>\n<li>Fixed start in Project Quality and Performance Management<\/li>\n<li>Fixed-duration scheduling in Project Quality and Performance Management<\/li>\n<li>Fixed-price in Project Quality and Performance Management<\/li>\n<li>Float in Project Quality and Performance Management<\/li>\n<li>Forecast at completion in Project Quality and Performance Management<\/li>\n<li>Forecast Final Cost in Project Quality and Performance Management<\/li>\n<li>Forward Pass in Project Quality and Performance Management<\/li>\n<li>FPIF in Project Quality and Performance Management<\/li>\n<li>Fragnet in Project Quality and Performance Management<\/li>\n<li>Free Float (FF) in Project Quality and Performance Management<\/li>\n<li>FS in Project Quality and Performance Management<\/li>\n<li>Functional Manager in Project Quality and Performance Management<\/li>\n<li>Functional matrix in Project Quality and Performance Management<\/li>\n<li>Functional organization in Project Quality and Performance Management<\/li>\n<li>Functional Requirements in Project Quality and Performance Management<\/li>\n<li>Functional specification in Project Quality and Performance Management<\/li>\n<li>Funding profile in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"G\">G<\/h2>\n<ul>\n<li>Gantt chart in Project Quality and Performance Management<\/li>\n<li>GERT in Project Quality and Performance Management<\/li>\n<li>Goal in Project Quality and Performance Management<\/li>\n<li>Grade in Project Quality and Performance Management<\/li>\n<li>Graphical Evaluation and Technique (GERT) in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"H\">H<\/h2>\n<ul>\n<li>Hammock activity in Project Quality and Performance Management<\/li>\n<li>Hammock in Project Quality and Performance Management<\/li>\n<li>Handover in Project Quality and Performance Management<\/li>\n<li>Hanger in Project Quality and Performance Management<\/li>\n<li>hierarchical coding structure in Project Quality and Performance Management<\/li>\n<li>Hierarchy of networks in Project Quality and Performance Management<\/li>\n<li>Histogram in Project Quality and Performance Management<\/li>\n<li>Holiday in Project Quality and Performance Management<\/li>\n<li>Host organization in Project Quality and Performance Management<\/li>\n<li>Hypercritical activities in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"I\">I<\/h2>\n<ul>\n<li>IFB in Project Quality and Performance Management<\/li>\n<li>Impact analysis in Project Quality and Performance Management<\/li>\n<li>Impact in Project Quality and Performance Management<\/li>\n<li>Implementation phase in Project Quality and Performance Management<\/li>\n<li>Imposed date in Project Quality and Performance Management<\/li>\n<li>Imposed finish in Project Quality and Performance Management<\/li>\n<li>Imposed start in Project Quality and Performance Management<\/li>\n<li>In progress in Project Quality and Performance Management<\/li>\n<li>In-house project in Project Quality and Performance Management<\/li>\n<li>Incident Management in Project Quality and Performance Management<\/li>\n<li>Inclusive OR relationship in Project Quality and Performance Management<\/li>\n<li>Incurred costs in Project Quality and Performance Management<\/li>\n<li>Indirect cost in Project Quality and Performance Management<\/li>\n<li>Information Distribution in Project Quality and Performance Management<\/li>\n<li>Initiation in Project Quality and Performance Management<\/li>\n<li>Input-Process-Output in Project Quality and Performance Management<\/li>\n<li>Inspection in Project Quality and Performance Management<\/li>\n<li>Integrated Cost\/Schedule Reporting in Project Quality and Performance Management<\/li>\n<li>Integrated logistics support in Project Quality and Performance Management<\/li>\n<li>Integration in Project Quality and Performance Management<\/li>\n<li>Internal rate of return (IRR) in Project Quality and Performance Management<\/li>\n<li>Interoperability in Project Quality and Performance Management<\/li>\n<li>Inverted matrix in Project Quality and Performance Management<\/li>\n<li>Invitation for Bid (IFB) in Project Quality and Performance Management<\/li>\n<li>Ishikawa Diagram in Project Quality and Performance Management<\/li>\n<li>Issue in Project Quality and Performance Management<\/li>\n<li>Issue Log in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"K\">K<\/h2>\n<ul>\n<li>Key Event Schedule in Project Quality and Performance Management<\/li>\n<li>Key Performance Indicators in Project Quality and Performance Management<\/li>\n<li>Key Result Area in Project Quality and Performance Management<\/li>\n<li>Key Success Factor in Project Quality and Performance Management<\/li>\n<li>Knowledge Management in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"L\">L<\/h2>\n<ul>\n<li>Labor rate variances in Project Quality and Performance Management<\/li>\n<li>Ladder in Project Quality and Performance Management<\/li>\n<li>Lag in Project Quality and Performance Management<\/li>\n<li>Late dates in Project Quality and Performance Management<\/li>\n<li>Late event date in Project Quality and Performance Management<\/li>\n<li>Late Finish Date (LF) in Project Quality and Performance Management<\/li>\n<li>Late Start Date (LS) in Project Quality and Performance Management<\/li>\n<li>Latest event time in Project Quality and Performance Management<\/li>\n<li>Latest finish time in Project Quality and Performance Management<\/li>\n<li>Latest start time in Project Quality and Performance Management<\/li>\n<li>Lead contractor in Project Quality and Performance Management<\/li>\n<li>Lead in Project Quality and Performance Management<\/li>\n<li>Leadership in Project Quality and Performance Management<\/li>\n<li>Lean Manufacturing in Project Quality and Performance Management<\/li>\n<li>Lean Six Sigma in Project Quality and Performance Management<\/li>\n<li>Lessons Learned in Project Quality and Performance Management<\/li>\n<li>Lessons Learned Report in Project Quality and Performance Management<\/li>\n<li>Letter of intent in Project Quality and Performance Management<\/li>\n<li>Level of Effort (LOE) in Project Quality and Performance Management<\/li>\n<li>Leveling in Project Quality and Performance Management<\/li>\n<li>LF in Project Quality and Performance Management<\/li>\n<li>Life cycle in Project Quality and Performance Management<\/li>\n<li>Life-cycle Costing in Project Quality and Performance Management<\/li>\n<li>Lifecycle Costing in Project Quality and Performance Management<\/li>\n<li>Likelihood in Project Quality and Performance Management<\/li>\n<li>Link in Project Quality and Performance Management<\/li>\n<li>Linked bar chart in Project Quality and Performance Management<\/li>\n<li>LOE in Project Quality and Performance Management<\/li>\n<li>Logic diagram in Project Quality and Performance Management<\/li>\n<li>Logic in Project Quality and Performance Management<\/li>\n<li>Logical Relationship in Project Quality and Performance Management<\/li>\n<li>Loop in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"M\">M<\/h2>\n<ul>\n<li>Management by project in Project Quality and Performance Management<\/li>\n<li>Management development in Project Quality and Performance Management<\/li>\n<li>Management Information System in Project Quality and Performance Management<\/li>\n<li>Management Reserve in Project Quality and Performance Management<\/li>\n<li>Mandate in Project Quality and Performance Management<\/li>\n<li>Master network in Project Quality and Performance Management<\/li>\n<li>Master Schedule in Project Quality and Performance Management<\/li>\n<li>Material in Project Quality and Performance Management<\/li>\n<li>Mathematical Analysis in Project Quality and Performance Management<\/li>\n<li>Matrix Organization in Project Quality and Performance Management<\/li>\n<li>Measurement Systems in Project Quality and Performance Management<\/li>\n<li>Methodology in Project Quality and Performance Management<\/li>\n<li>Mid-stage assessment in Project Quality and Performance Management<\/li>\n<li>Milestone in Project Quality and Performance Management<\/li>\n<li>Milestone plan in Project Quality and Performance Management<\/li>\n<li>Monitoring and Controlling in Project Quality and Performance Management<\/li>\n<li>Monte Carlo Simulation in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"N\">N<\/h2>\n<ul>\n<li>Net Present Value in Project Quality and Performance Management<\/li>\n<li>Non-conformance in Project Quality and Performance Management<\/li>\n<li>Non-Functional Requirements in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"O\">O<\/h2>\n<ul>\n<li>Operational Requirements in Project Quality and Performance Management<\/li>\n<li>Output in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"P\">P<\/h2>\n<ul>\n<li>Pareto Chart in Project Quality and Performance Management<\/li>\n<li>Performance Baseline in Project Quality and Performance Management<\/li>\n<li>Performance Management Plan in Project Quality and Performance Management<\/li>\n<li>Performance Metrics in Project Quality and Performance Management<\/li>\n<li>Performance Reporting in Project Quality and Performance Management<\/li>\n<li>PERT Chart in Project Quality and Performance Management<\/li>\n<li>Plan Quality Management in Project Quality and Performance Management<\/li>\n<li>Plan-Do-Check-Act in Project Quality and Performance Management<\/li>\n<li>Portfolio Management in Project Quality and Performance Management<\/li>\n<li>Post-Implementation Review in Project Quality and Performance Management<\/li>\n<li>Preventive Action in Project Quality and Performance Management<\/li>\n<li>Problem Solving in Project Quality and Performance Management<\/li>\n<li>Process Control in Project Quality and Performance Management<\/li>\n<li>Process Improvement in Project Quality and Performance Management<\/li>\n<li>Process Management in Project Quality and Performance Management<\/li>\n<li>Process Mapping in Project Quality and Performance Management<\/li>\n<li>Process Variation in Project Quality and Performance Management<\/li>\n<li>Product Requirements in Project Quality and Performance Management<\/li>\n<li>Product Scope in Project Quality and Performance Management<\/li>\n<li>Product vs Service Quality in Project Quality and Performance Management<\/li>\n<li>Project Control Systems in Project Quality and Performance Management<\/li>\n<li>Project Manager in Project Quality and Performance Management<\/li>\n<li>Project Performance in Project Quality and Performance Management<\/li>\n<li>Project Progress Measurement in Project Quality and Performance Management<\/li>\n<li>Project Quality Cost in Project Quality and Performance Management<\/li>\n<li>Project Quality in Project Quality and Performance Management<\/li>\n<li>Project Quality Management in Project Quality and Performance Management<\/li>\n<li>Project Quality Plan in Project Quality and Performance Management<\/li>\n<li>Project Quality Planning in Project Quality and Performance Management<\/li>\n<li>Project Scheduling for Performance in Project Quality and Performance Management<\/li>\n<li>Project Team Building in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"Q\">Q<\/h2>\n<ul>\n<li>Quality Assurance in Project Quality and Performance Management<\/li>\n<li>Quality Control in Project Quality and Performance Management<\/li>\n<li>Quality Function Deployment in Project Quality and Performance Management<\/li>\n<li>Quality Gate in Project Quality and Performance Management<\/li>\n<li>Quality in Project Quality and Performance Management<\/li>\n<li>Quality Management in Project Quality and Performance Management<\/li>\n<li>Quality Management Plan in Project Quality and Performance Management<\/li>\n<li>Quality Metrics in Project Quality and Performance Management<\/li>\n<li>Quality Planning in Project Quality and Performance Management<\/li>\n<li>Quality Policy in Project Quality and Performance Management<\/li>\n<li>Quality Principles in Project Quality and Performance Management<\/li>\n<li>Quality Review in Project Quality and Performance Management<\/li>\n<li>Quality Standards in Project Quality and Performance Management<\/li>\n<li>Quality System in Project Quality and Performance Management<\/li>\n<li>Quality Team in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"R\">R<\/h2>\n<ul>\n<li>RACI Matrix in Project Quality and Performance Management<\/li>\n<li>Regression Analysis in Project Quality and Performance Management<\/li>\n<li>Requirements Management in Project Quality and Performance Management<\/li>\n<li>Requirements Traceability Matrix in Project Quality and Performance Management<\/li>\n<li>Resource Optimization in Project Quality and Performance Management<\/li>\n<li>Risk Assessment in Project Quality and Performance Management<\/li>\n<li>Risk Management Plan in Project Quality and Performance Management<\/li>\n<li>Root Cause Analysis in Project Quality and Performance Management<\/li>\n<li>Root Cause Identification in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"S\">S<\/h2>\n<ul>\n<li>Scope Baseline in Project Quality and Performance Management<\/li>\n<li>Scoring Model in Project Quality and Performance Management<\/li>\n<li>Service Level Agreement in Project Quality and Performance Management<\/li>\n<li>Six Sigma in Project Quality and Performance Management<\/li>\n<li>Six Sigma Tools in Project Quality and Performance Management<\/li>\n<li>SMART Objectives in Project Quality and Performance Management<\/li>\n<li>Special Cause in Project Quality and Performance Management<\/li>\n<li>Stakeholder Management in Project Quality and Performance Management<\/li>\n<li>Statistical Process Control in Project Quality and Performance Management<\/li>\n<li>Statistical Sampling in Project Quality and Performance Management<\/li>\n<li>SWOT Analysis in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"T\">T<\/h2>\n<ul>\n<li>Technical Performance Measurement in Project Quality and Performance Management<\/li>\n<li>Test Plan in Project Quality and Performance Management<\/li>\n<li>Theory of Constraints in Project Quality and Performance Management<\/li>\n<li>Time and Cost Estimating for Performance in Project Quality and Performance Management<\/li>\n<li>Tolerance in Project Quality and Performance Management<\/li>\n<li>Total Productive Maintenance in Project Quality and Performance Management<\/li>\n<li>Total Quality Management in Project Quality and Performance Management<\/li>\n<li>Traceability in Project Quality and Performance Management<\/li>\n<li>Tracking Key Measurements in Project Quality and Performance Management<\/li>\n<li>Training Needs Assessment in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"V\">V<\/h2>\n<ul>\n<li>Value Engineering in Project Quality and Performance Management<\/li>\n<li>Variance Analysis in Project Quality and Performance Management<\/li>\n<li>Verification and Validation in Project Quality and Performance Management<\/li>\n<li>Verification in Project Quality and Performance Management<\/li>\n<li>Voice of the Customer in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<h2 id=\"W\">W<\/h2>\n<ul>\n<li>Work Breakdown Structure in Project Quality and Performance Management<\/li>\n<li>Work Breakdown Structures for Performance in Project Quality and Performance Management<\/li>\n<\/ul>\n<div><a href=\"#top\">Go to Top<\/a><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Important definitions and terminologies used in Project Quality and Performance Management ABCDEFGHIKLMNOPQRSTVW A Abstract resource in Project Quality and Performance Management Acceptance criteria in Project Quality and Performance Management Acceptance in Project Quality and Performance Management Acceptance test in Project Quality and Performance Management Accountability Matrix in Project Quality and Performance Management Accounting Quality (Quality&#8230;<\/p>\n","protected":false},"author":10,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-128586","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Project Quality and Performance Management Glossary - Tutorial<\/title>\n<meta name=\"description\" content=\"What is Project Quality and Performance Management? Project Quality and Performance Management glossary page lists important terms, terminologies and definitions in Project Quality and Performance Management listed with brief details as a dictionary. Enrich your knowledge and skills in Project Quality and Performance Management\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Quality and Performance Management Glossary - Tutorial\" \/>\n<meta property=\"og:description\" content=\"What is Project Quality and Performance Management? Project Quality and Performance Management glossary page lists important terms, terminologies and definitions in Project Quality and Performance Management listed with brief details as a dictionary. Enrich your knowledge and skills in Project Quality and Performance Management\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/\" \/>\n<meta property=\"og:site_name\" content=\"Tutorial\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/vskills.in\/\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-12T09:02:21+00:00\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/\",\"name\":\"Project Quality and Performance Management Glossary - Tutorial\",\"isPartOf\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#website\"},\"datePublished\":\"2023-05-08T06:34:04+00:00\",\"dateModified\":\"2024-04-12T09:02:21+00:00\",\"description\":\"What is Project Quality and Performance Management? Project Quality and Performance Management glossary page lists important terms, terminologies and definitions in Project Quality and Performance Management listed with brief details as a dictionary. Enrich your knowledge and skills in Project Quality and Performance Management\",\"breadcrumb\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.vskills.in\/certification\/tutorial\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Quality and Performance Management Glossary\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#website\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/\",\"name\":\"Tutorial\",\"description\":\"Vskills - A initiative in elearning and certification\",\"publisher\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.vskills.in\/certification\/tutorial\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#organization\",\"name\":\"Vskills\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg\",\"contentUrl\":\"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg\",\"width\":73,\"height\":55,\"caption\":\"Vskills\"},\"image\":{\"@id\":\"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/vskills.in\/\",\"https:\/\/x.com\/vskills_in\",\"https:\/\/www.linkedin.com\/company-beta\/1371554\/\",\"https:\/\/www.youtube.com\/channel\/UCMWnscxPwRF_PqXo9B7q_Tw\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Quality and Performance Management Glossary - Tutorial","description":"What is Project Quality and Performance Management? Project Quality and Performance Management glossary page lists important terms, terminologies and definitions in Project Quality and Performance Management listed with brief details as a dictionary. Enrich your knowledge and skills in Project Quality and Performance Management","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/","og_locale":"en_US","og_type":"article","og_title":"Project Quality and Performance Management Glossary - Tutorial","og_description":"What is Project Quality and Performance Management? Project Quality and Performance Management glossary page lists important terms, terminologies and definitions in Project Quality and Performance Management listed with brief details as a dictionary. Enrich your knowledge and skills in Project Quality and Performance Management","og_url":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/","og_site_name":"Tutorial","article_publisher":"https:\/\/www.facebook.com\/vskills.in\/","article_modified_time":"2024-04-12T09:02:21+00:00","twitter_misc":{"Est. reading time":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/","url":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/","name":"Project Quality and Performance Management Glossary - Tutorial","isPartOf":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#website"},"datePublished":"2023-05-08T06:34:04+00:00","dateModified":"2024-04-12T09:02:21+00:00","description":"What is Project Quality and Performance Management? Project Quality and Performance Management glossary page lists important terms, terminologies and definitions in Project Quality and Performance Management listed with brief details as a dictionary. Enrich your knowledge and skills in Project Quality and Performance Management","breadcrumb":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/project-quality-and-performance-management-glossary\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.vskills.in\/certification\/tutorial\/"},{"@type":"ListItem","position":2,"name":"Project Quality and Performance Management Glossary"}]},{"@type":"WebSite","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#website","url":"https:\/\/www.vskills.in\/certification\/tutorial\/","name":"Tutorial","description":"Vskills - A initiative in elearning and certification","publisher":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vskills.in\/certification\/tutorial\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#organization","name":"Vskills","url":"https:\/\/www.vskills.in\/certification\/tutorial\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/","url":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg","contentUrl":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-content\/uploads\/2017\/07\/vskills-min-logo.jpg","width":73,"height":55,"caption":"Vskills"},"image":{"@id":"https:\/\/www.vskills.in\/certification\/tutorial\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/vskills.in\/","https:\/\/x.com\/vskills_in","https:\/\/www.linkedin.com\/company-beta\/1371554\/","https:\/\/www.youtube.com\/channel\/UCMWnscxPwRF_PqXo9B7q_Tw"]}]}},"_links":{"self":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages\/128586","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/comments?post=128586"}],"version-history":[{"count":3,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages\/128586\/revisions"}],"predecessor-version":[{"id":128698,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/pages\/128586\/revisions\/128698"}],"wp:attachment":[{"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/media?parent=128586"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/categories?post=128586"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vskills.in\/certification\/tutorial\/wp-json\/wp\/v2\/tags?post=128586"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}