Site icon Tutorial

V Model

Go back to Tutorial

V Model

V model is also known as the Verification and Validation model. In this, the testing phase goes side by side with the development phase. Therefore, the testing phase starts right at the beginning of the SDLC. For example during the requirement analysis phase, acceptance-test cases are prepared by the testing team; during the system design phase, the system test case is prepared.

Likewise, for each phase of development, a corresponding QA activity occurs. Further, the deliverable once ready uses QA artifacts to conduct the testing. Besides this, each phase of the development phase requires verification before moving to the next phase.

Advantages of V Model

Disadvantages of V Model

 

Get certified and unlock more opportunities. Practice and Validate your skills to become a Certified Manual Tester Now!

Go back to Tutorial

Exit mobile version